← Lift Planning

What should be included in the lift plan for a rooftop HVAC replacement in a dense urban site?

LIFT-001 · Lift Planning
Include crane specifications, load calculations, rigging plan, site access routes, overhead clearances, ground conditions, and safety exclusion zones.
A comprehensive lift plan for rooftop HVAC replacement must address the unique challenges of urban construction. Begin with detailed load calculations including the weight of old and new equipment, rigging hardware, and any lifting accessories. Document crane positioning options, considering street closures, parking restrictions, and proximity to buildings or power lines.
Reference: OSHA 1926.1417 - Operation requirements for cranes and derricks in construction
Remember: CLOGS-RS: Crane specs, Load calcs, Overhead clearance, Ground conditions, Safety zones, Rigging plan, Site access

Keywords

lift planningcritical lift plancrane setup

Operators: Add your profile to get matched with jobs. Free.

Add My Profile Job Alerts

Was this helpful?